Skip to content

Nautical Twilight Schedule

Generate a yearly streetlight operating schedule for any location. Returns daily nautical dusk (lights ON) and nautical dawn (lights OFF) times.

The placeholder coordinates (36.7456, −93.4712) are the US Census population-weighted centroid for the United States, near Hartville, MO — useful for understanding average streetlight operating times across the country. For regional analysis (e.g., crashes in Kansas or the Denver metro area), use a state or metropolitan area population-weighted centroid from the same Census reference. Streetlights turn ON at −6° sun elevation (end of civil twilight) and OFF at −6° (start of civil twilight).

Phase Calculator

Upload a CSV with coordinates and timestamps. Each record gets tagged with sun elevation, twilight phase, and streetlight status.

1. Upload CSV

Drop a .csv file here or

Maximum 2.5 million rows

2. Map Columns

Confirm which columns contain your location and date/time fields.

3. Processing

Splitting and processing your data...

4. Download Results

Download CSV

Error

GIS Service Discovery

Search across multiple public GIS servers by keyword. This crawls each server's ArcGIS REST catalog directly and live, in real time.

0 sources

Searching GIS services...

Results

Safety & Lighting

Every US fatal crash with usable coordinates (NHTSA FARS, 1999–2024), run through the Phase Calculator to determine whether street lighting was providing visibility at the moment of the crash. Ask the assistant about the data, or about lighting ordinances and standards.

Street lighting providing visibilitySun providing visibility
Loading map…
Ask about fatal crashes and lighting. Answers from the data state the years and filters used; answers about ordinances and standards cite their source.
How lighting is determined. For each crash the Phase Calculator computes the sun's position from the crash coordinates and local time. evStreetlightsOn is true when street lighting was providing visibility and false when the sun was. This is the only lighting determination used here; the police-reported FARS light-condition field is available in the data for reference but is not the indicator. Crashes without coordinates (all years before 1999) or with an unknown crash hour are stored but cannot be determined and do not appear on the map. Data: NHTSA FARS national files; processing by Photometrics AI.

Street Light Avoided Cost

A photocell turns a street light on before dark and runs it at full power until after dawn, through the evening hours when power costs the grid the most. Upload your street lights to see what running them on Photometrics AI's dimmed schedule is worth to the utility system, light by light, priced hour by hour with the California Public Utilities Commission's 2026 Avoided Cost Calculator (ACC). Covers lights in PG&E, SCE and SDG&E territory.

Schedules compared, for every light
  • Today (photocell): on 30 minutes before dusk, off 30 minutes after dawn, full power all night.
  • With Photometrics AI: on at dusk, off at dawn, 25% dimmed all night and 50% dimmed from 1 to 5 AM.

Dusk and dawn are the moments the sun reaches −6° (nautical dusk/dawn), calculated for each light's location. One fixture per row.

1. Upload CSV

Drop a .csv file here or

One row per light: latitude, longitude, wattage. Maximum 50,000 rows.

Try it with sample data: 30 lights of 50 W across Chula Vista (SDG&E, two climate zones).

2. Map Columns

3. Calculating

Computing dusk and dawn for every light and every night of the year...

4. Results

median avoided cost per light, $/year
total avoided cost, $/year ( lights)
energy saved, kWh/year ( of photocell use)
average avoided cost per kWh saved
Summer vs. winter value
What the avoided cost is made of
Lights not valued

    Download CSV
    Loading map…

    Error

    What this number is. The avoided cost to the utility system (CPUC 2026 ACC Electric Model v1b, Total Resource Cost test, 2026 values only, all cost components), not a saving on the light owner's bill. It includes the ACC's greenhouse-gas adder, shown separately in the results.
    Methodology

    We estimate the avoided-cost value of each street light by pairing its hour-by-hour operating schedule with the CPUC 2026 Avoided Cost Calculator (ACC) Electric Model v1b. For each location we calculate when the sun reaches −6° at dusk and dawn for every day of 2018, the calendar year the 2026 ACC is built on. From those times we build two schedules: a photocell baseline that turns on 30 minutes before dusk and off 30 minutes after dawn at full power, and a controlled schedule that runs from dusk to dawn at 75% power and drops to 50% power from 1 to 5 AM local time. Both schedules are converted to Coordinated Universal Time and split into the 8,760 hourly periods of the ACC. Each hour's energy savings are multiplied by that hour's 2026 avoided cost for the light's utility and climate zone, using the model's Total Resource Cost settings with a one-year period (2026 values only) and all cost components included. Summer and winter use the ACC model's own seasons for each utility: PG&E May–October, SCE June–September, SDG&E May–September.

    The ACC documentation does not state the time basis of its hourly values. The model output has exactly 24 hours every day with no daylight-saving gaps or repeats, and the hourly pattern (the midday solar price dip and the evening peak) matches Pacific Standard Time, so we treat every ACC hour as Pacific Standard Time (UTC−8) all year. We could not definitively confirm this, and Appendix A.3 notes that daylight-saving time was “taken into account” when transmission and distribution factors were remapped to the 2018 calendar. We have asked the ACC authors to clarify the time basis and will update the analysis if it differs.

    Utility and climate zone come from California Energy Commission utility service territories intersected with CEC building climate zones. Water and wholesale power entities whose territories overlap retail utilities (Metropolitan Water District, PWRPA, Eastside Power Authority) are not used. Where an investor-owned utility's territory overlaps a municipal utility's (for example, PG&E and San Francisco's Hetch Hetchy power), the light is valued at the investor-owned utility's avoided cost and flagged in the acc_note column. Climate Zone 3 is split into 3A (San Francisco) and 3B (the rest); the ACC does not publish that boundary. Lights served by municipal utilities and other utilities without an ACC, and utility/climate-zone combinations the ACC model does not include, are not valued.

    Source: CPUC Distributed Energy Resources cost-effectiveness: Avoided Cost Calculator, adopted in Resolution E-5476 per D.26-09-007.